MAITLAND RAIL WORKS 2016

ARTC

In late 2016 Limelight was tasked with covering a 96 hour rail line possession a stone's throw away from Maitland Railway Station. The right two tracks in the line remained live during the possession, which meant safety was absolutely paramount when installing and derigging our cameras.

 

Once in the edit suite our staff took the tens of thousands of raw shots and massaged them into a finished piece that seamlessly and dynamically slowed the edit down in places to focus on the action and sped up other sections to skip through the periods of inactivity before and after the work.

 

A time and date counter was added to the finished video, accurate to the minute.

From national campaigns to small business, we’ll put together
a package to suit your needs.
Get in touch!

Contact Us

Site designed by Limelight Creative Media © 2018                     Privacy Policy